But I am Almost finished with the dome hole! Just a couple more days and at least that part should be finished. Then I have to push all that dirt downhill to finish the road. Although the road won’t actually be finished until I put the gravel on it. And I can’t put the gravel on it until I get the trenches for the power and water dug and refilled. Sigh…. Seems like there’s always something to do before I can finish something else…
You Got It! Another Day Moving Dirt!
But I am getting a lot of dirt pushed around and out of the “Dome Holeâ€. Put some pictures up at my webshots site. I really do think I’m about as deep as I’m going to be able to go. Mostly because I have no place to put the dirt I move. And I’m getting kind of tired of moving it. I have so much more to move too…
Pretty normal day for me…
Yep, out at the property moving dirt again. That’s what I do on days it doesn’t actually rain. Got a LOT moved today. I think I’m about as far down as I’m going to go in the dome hole. Now the opening to the dome hole is full of dirt that I get to push downhill. Ought to have plenty of dirt for the bottom of the road!
Damn nice day out. Well, it could have been 20 degrees warmer; but it wasn’t raining or snowing! That’s always a plus up here!
Put The New Hydraulic Hose On Today…
Took the new hydraulic hose out and spent about 20 minutes running it where the old one was. Then took 5 minutes to take it back out because I had put it in wrong end first. Then another 20 minutes putting it back. Screwing the one end of the hose in was a bear but it mostly went in easily. Then the next hour was spent putting the dozer back together. Phew. But I did get to push dirt today and pushed a lot. The dome hole is starting to look like a hole again! Cool!